Sun Java Communications Suite 7 Upgrade Guide
This information describes the best practices for upgrading earlier versions of Communications Suite products to version 7. (For a list of those individual product version numbers see Communications Suite 7 Products and Components.)
Topics:
- About This Information
- About the Communications Suite Upgrade Process
- Defining Your Target Communications Suite Deployment
- Determining the Sequence of Product Upgrades
- Upgrading Messaging Server
- Upgrading Calendar Server in Solaris OS
- Upgrading Instant Messaging Server
- Upgrading Sun Convergence
- Upgrading Delegated Administrator
- Upgrading comm_dssetup.pl
- Upgrading Sync
- Upgrading Outlook Connector
About This Information
In this information, the terms products, product components, and shared components are used. Products are items such as Messaging Server, Calendar Server, Delegated Administrator, and Instant Messaging Server. Product components are functional parts of the products. For example, Messaging Server has message stores, relays, and messaging multiplexors. Calendar Server has front-end and back-end servers. Shared resources are software components that are not part of Communications Suite or other support products, but are required for Communications Suite products to operate. Examples include NFS, SASL, and Java.
About the Communications Suite Upgrade Process
Communications Suite 7 consists of a number of individual products, product components and shared resources, and there is no single system utility that upgrades all Communications Suite components at once. Upgrading a Communications Suite deployment consists of upgrading component-by-component and computer-by-computer, using the component-specific upgrade procedures described in this information. Some of these procedures are as simple as adding upgrade patches to the existing software. Other procedures are more complex and require considerably more planning and preparation. Proper upgrading starts with knowing what products you want to upgrade and the order in which to upgrade them.
Defining Your Target Communications Suite Deployment
A successful upgrade depends on knowing where you are (your current deployment) and where you are going (your target deployment). By defining your target deployment, you know what products and components you need to upgrade and which ones can remain as is.
The three most common Communications Suite upgrade scenarios are:
- Upgrade for a Product Feature. There is a specific feature you want from a specific product and you are only interested in upgrading the products and components necessary to support that feature.
In this scenario, you simply upgrade the desired product. See the product-specific upgrade section(s)on this page.
- Upgrade to use Sun Convergence. You only want to upgrade the products and components necessary to use Sun Convergence.
The minimum product versions that can still run Convergence are listed in Product Version Compatibility Requirements for Convergence 1 Update 3.
- You want to upgrade all products and components to the latest release.
You upgrade each product individually, host-by-host. See Requirements for Communications Suite 7.
Once you have chosen the scenario that best fits your situation, you know what products to upgrade.
| Tip Installing Only Shared Components: To install just the shared components for a component product, launch the Communications Suite installer then prefix your product selection with a tilde (~). For example, to install only the shared components for Messaging Server 64-bit, at the Product Selection prompt, you would type ~1. You can type multiple selections, separating your entries with a comma. |
Determining the Sequence of Product Upgrades
The order in which the Communications Suite product and versions are upgraded can be critical. Use the following guidelines to determine the upgrade sequence for Communications Suite products:
- For upgrading a pre-6.3 Messaging Server you must upgrade the messages store components to 6.3 or later before upgrading the webmail server (previously called MEM) to 6.3 or later.
The rest of this guide describes how to upgrade each of the Communications Suite products.
Upgrading Messaging Server
See Messaging Server 7 Update 3 Upgrade.
Upgrading Messaging Server in an HA (High Availability) Environment
See Upgrading to Messaging Server 7 Update 3 in an HA Environment.
Upgrading Calendar Server in Solaris OS
See Calendar Server 6.3 Upgrade.
Upgrading Calendar Server in an HA (High Availability) Environment
See Upgrading Calendar Server 6.3 in an HA Environment.
Upgrading Instant Messaging Server
See Instant Messaging 8 Update 2 Upgrade.
Upgrading the Instant Messaging Server in an HA (High Availability) Environment
See Upgrading to Instant Messaging 8 Update 2 in an HA Environment.
Upgrading Sun Convergence
To upgrade from Sun Convergence 1 Update 2 to Sun Convergence 1 Update 3, see Upgrading to Convergence 1 Update 3.
Upgrading Delegated Administrator
See Delegated Administrator 7 Upgrade.
Upgrading comm_dssetup.pl
It is important to run the latest version of comm_dssetup.pl to prepare the schema, index, and data in your Directory Server to work with Messaging Server, Calendar Server, Instant Messaging, Delegated Administrator, or any products that depend on the Directory Server.
Run commpkg upgrade to upgrade comm_dssetup.pl and then run perl comm_dssetup.pl. For upgrade details see commpkg upgrade Usage
Upgrading Sync
Using Sun Java System Communications Sync with Communications Suite 7 and Sun Convergence requires the following:
- Sun Java System Communications Sync Version 3.1. Note that Sync 3.1 is the same as 3.0 with additional fixes.
Upgrading Outlook Connector
See Connector for Microsoft Outlook 7.3 Update 1 Upgrade Guide.


Comments (2)
Jan 08, 2008
shjorth_sun says:
It would be useful to have a matrix of certified (QA tested) & supported (no...It would be useful to have a matrix of certified (QA tested) & supported (not tested but theoretically possible) combinations & not-supported (known to not work) of products & configurations. This will help address the common support questions that occur after the introduction of new products e.g. can I use directory server 5 with messaging server 6.3? Do I need to upgrade to Schema 2? Can I use legacy/realm Access Manager configuration with Instant Messenger?
This is especially true now that components such as directory server/web server/access manager etc. are no longer bundled with the installer.
So for messaging server 7 for example, you can use any Sun directory server that is supported by the comm_dssetup.pl utility (as this is a pre-requisite). comm_dssetup.pl works with 5.2 and 6.0/6.1/6.2, but we don't test against 5.2 anymore so this is not a certified combination. On the other hand another 3rd party directory e.g. openldap is not-supported.
—
Need information on how to migrate customisations with updated versions e.g. Delegated Administrator interface customisations will need to be reapplied manually, UWC customisations are kept as part of the patch-config/install-newconfig steps.
—
backout strategies - this is especially important for messaging server store data which is being fundamentally changed in MS7.0 due to the large mailbox store.* related changes.
Jul 02, 2008
Greg.Kimura says:
How about this section for a requirements/compatibility matrix .How about this section for a requirements/compatibility matrix .